THE GOULANDRIS NATURAL HISTORY MUSEUM
GREEK BIOTOPE WETLAND CENTRE

   
   



Funded by the Hellenic Ministry of Foreign Affairs
HELLENIC AID

 

RESTORATION MEASURES: Wastewater treatment facilities

The objective is to elaborate the appropriate studies and construct the required facilities/technical works, for municipal and industrial wastewater treatment in the Doiran catchment. 

In particular, the following are proposed:

      FYROM

1.   Construction of a sewage collecting system, for the transfer of municipal wastewaters from Nikolic to the Topletc WWTP (total length of approximately 6 km).

2.   Construction of a sewage collecting system in Nikolic, for the collection of the produced municipal wastewaters (approximately 150 housholds).

3.   Completion of the existing sewage collecting systems in Nov Dojran and Star Dojran (for approximately 1000 households and weekend houses).

4.   Study regarding the investigation of industrial wastewaters affecting Lake Doiran .

5.   Elaboration of reuse studies, regarding the use of treated wastewaters for irrigation purposes.

      
     GREECE

1.   Elaboration of the required technical studies (according to Greek legislation), for the construction of a) sewage collecting systems and b) constructed wetlands, in the villages of Akrita, Amaranta, Agia Paraskevi, Mouries, Myriophyto and Mouries RS.

2.   Construction of the above mentioned, under point 1, facilities (i.e. sewage collecting systems and constructed wetlands).

3.   Elaboration of reuse studies, regarding the use of treated wastewaters for irrigation purposes.

                                                                                                          Previous    Next

 


Page 4 of 7


Copyright EKBY-2006.
Web creation: Lena Hatziiordanou